HomeServices
Surveys, MEP works, renovation and maintenance for buildings that stay open
Hotels first, and hospitals as well. Start with the one you need now. A survey for one service often shows what the building needs next.
Where to start
Site visit: a walk-round with your chief engineer and a short scope note. Assessment: a full condition report and CapEx plan, at a fee confirmed in writing first.
See what an assessment delivers: a sample condition report (CT-01, PDF)
Assess, upgrade, run
-
Assess
Technical consultancy
Condition surveys, technical due diligence before an acquisition, and CapEx plans in which each line carries an estimate, its basis and a contingency.
-
Upgrade
Conversion and renovation
Brand property improvement plans (PIPs), re-flagging and refurbishment: the survey, the technical scope and the works, phased so the hotel stays open.
-
Upgrade
MEP contracting
Air conditioning, power, fire safety and water, run by our engineers and installed by crews we prequalify and check daily.
-
Run
Technical maintenance
Planned and reactive maintenance on a monthly agreement, with the visit schedule and response times written into the contract.
How each service is contracted
| Service | What it covers | Contract basis | Next step |
|---|---|---|---|
| Hotel Technical Assessment (CT-01)View a sample | Engineering survey, condition report and CapEx plan | Fixed fee, quoted before the visit | Request a fixed-fee assessment proposal |
| Brand conversion (PIP) | MEP, fire safety, HVAC and electrical works for a brand PIP | Project contract, priced against the signed scope | Request a site visit |
| Hotel renovation | Guest-room and public-area MEP works for a refresh, floor by floor | Project contract, priced against the signed scope | Request a site visit |
| HVAC upgrade | Chiller, air handler or fan coil replacement, tested and balanced | Project contract, priced against the signed scope | Request a site visit |
| Fire and life safety (FLS) compliance | Inspection readiness, upgrades and maintenance, with fire systems installed by Civil Defense-licensed contractors | Fixed fee or project contract | Request a site visit |
| Hotel maintenance agreement | Planned and reactive maintenance | Monthly agreement | Request a site visit |
| Hospital technical assessment | Essential electrical system, medical gases, critical ventilation, water and fire safety, surveyed and rated with a CapEx plan | Fixed fee, quoted before the visit | Request a fixed-fee assessment proposal |
| Tender or BOQ to price | Your drawings, specification and bill of quantities, priced and returned by your deadline | Your contract form | Request a site visit |
On project contracts the price is fixed against the signed scope, and anything outside it goes through a written variation. Defects period, retention and payment terms are set out in each proposal; manufacturers' warranties are listed separately from the defects period.
Not sure where to start