A monthly agreement that covers your plant, your fire systems and the call-outs in between. Every planned visit is on the calendar before the year starts, and every job closes with a sheet your engineer signs.
Example year plan · illustrative frequencies
A maintenance year for a mid-size hotel
Typical service frequency by asset group and month
Asset group
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ChillersRoof plant
AHUs and fan coilsPlant and guest rooms
PumpsChilled water, booster, transfer
LV switchboard and generatorBasement
Fire alarm and sprinklersDiesel fire pump run weekly by the hotel's shift technician; logs checked by us monthly
Water tanks and hot waterTanks, boosters, calorifiers
Monthly
Quarterly
Semi-annual
Annual
Reactive maintenance · how a call-out is logged and closed
Logged
Your team reports the fault by phone or message to our duty contact and gets a reference number straight away.
Prioritised
The priority is set with your duty engineer, using the categories written into the contract.
Attended
A technician or specialist attends within the response time agreed for that priority.
Fixed or made safe
Fixed on the spot, or made safe with a dated plan for the permanent repair and any parts.
Closed and signed
Closed only when your duty engineer signs the job sheet. It appears in the monthly report with the time it took.
The shape of the service levels: what each priority is measured on
Priority (example categories)
Acknowledge
On site
Made safe
Permanent fix
Cover
EmergencyA life-safety system out, or loss of cooling, power or water to guest floors
Agreed per site
Agreed per site
Agreed per site
Agreed per site
Agreed per site
UrgentA guest room out of order, or plant running without its standby
Agreed per site
Agreed per site
Agreed per site
Agreed per site
Agreed per site
RoutineAnything that can safely wait for the next planned visit
Agreed per site
Agreed per site
Agreed per site
Agreed per site
Agreed per site
Planned requestSmall works or changes the hotel asks for, booked into the plan
Agreed per site
Agreed per site
Not applicable
Agreed per site
Agreed per site
Acknowledge
Call logged and a reference number given
On site
A technician or specialist at the fault
Made safe
No risk to guests, staff or plant, even if not yet repaired
Permanent fix
Repaired and closed on a signed job sheet
Cover
The hours the priority applies: a visiting team with call-out, or a resident technician on larger hotels
Response and fix times for each priority are agreed in the contract. We don't publish standard numbers, because they depend on where the hotel is, the size of your in-house team and the cover you need.
CT-20Planned maintenance programme · example12 monthsExample only
What a maintenance agreement covers
The exact list is built from your asset register. These are the lines it usually contains.
Preventive
Planned preventive maintenance
Monthly, quarterly, semi-annual and annual visits on a fixed calendar, following the makers' manuals.
Corrective
Call-outs and repairs
Faults logged, prioritised, attended and closed with a signed job sheet, with response times set in the contract.
HVAC
HVAC servicing
Chillers, AHUs, fan coils and pumps: filters, coils, belts, condensate drains and controls. Condenser coils washed before summer, refrigerant leak checks and head-pressure logs, and chilled water treatment dosed and sampled.
Fire safety
Fire and life safety maintenance
Fire pump runs and logs, sprinklers, alarm and detection, voice evacuation, emergency lighting, with records kept the way Civil Defense asks for them. Fire system maintenance is carried out only by Civil Defense-licensed contractors, under our site management, so it counts toward your Salamah safety licence (رخصة السلامة).
Power
Electrical and standby power
Monthly generator runs on real load rather than idle starts, an annual load bank test, LV switchboard inspections and thermal imaging, distribution boards and lighting.
Coordinated
Specialist systems, in the same plan
Lifts and escalators stay under the maker's or a licensed lift contractor, with their inspection certificates tracked. Guest technology and extra-low-voltage (ELV) systems (key cards, Wi-Fi, IPTV, CCTV), LPG and pool plant stay with their specialists. We bring their visits into one calendar and one monthly report, and keep the power and interfaces we look after working.
Water
Water, hot water and drainage
Legionella controls to the hotel's water management plan: hot water stored at 60 °C and every outlet reaching 50 °C within one minute, as the plan sets, monthly sentinel-tap temperature checks and sampling. Tank cleaning and disinfection, booster setpoint and pressure-reducing valves, sump pumps and drain jetting.
Typical situations
When reactive calls crowd out planned maintenance
The in-house team is a few technicians and a night shift, and guest complaints eat every planned visit.
A conversion or upgrade has just been handed over, and the new plant has to be maintained to keep its warranty.
An operator or brand audit asks for PPM records the hotel can't produce.
Civil Defense asks for fire system maintenance records at renewal.
A maker's service contract is ending, and the hotel wants one agreement for all its plant.
A management company is preparing to open a hotel and needs maintenance in place from the first day.
How the engagement works
It starts with counting what you have
No one can maintain a building properly without an asset register. If you don't have one, building it is the first month's work.
Start-up survey
Every asset tagged with a barcode or QR label in a location hierarchy (building, floor, room or plant room, system, asset), with make, model, serial, install date and condition score, and any existing defects listed before the agreement starts.
PPM schedule
Your year plan, like the one above, built around occupancy and events.
Mobilise
Named contacts, call-out routes and permits agreed with your chief engineer.
Visits and call-outs
Planned visits on the calendar, call-outs logged and closed with signed sheets.
Monthly review
A report and a meeting: what was done, what was found, what needs a decision.
Who signs off
Asset register and defects list
Hotel chief engineer
Year plan
Chief engineer and general manager
Each planned visit and call-out
Duty engineer, on the job sheet
Monthly report
Chief engineer, copied to the owner if you ask
ServiceMonthly agreement
Hotel maintenance agreement
A monthly fee for the scope in your asset register. What the fee includes (labour, consumables, parts, call-outs) and the response and fix times are written into the agreement before it starts.
Fire system visits by Civil Defense-licensed contractors, managed by us
Manufacturer warranty visits coordinated in the same plan
What you receive
Records an auditor can follow
Brand audits, insurers and Civil Defense all ask the same question: show me it was done. These documents answer it, with the same codes as our full document register.
Ref
Document
What's in it
When
CT-19
Asset register
Every asset with its tag, location, make, age and condition, kept in your CAFM if you have one, or in a standard export your system can import. The register and the maintenance history belong to the hotel.
Month one
CT-20
PPM year plan
The calendar of visits for your building, by asset group.
Month one, reviewed yearly
CT-21
Signed job sheets
One per visit or call-out: what was checked, found and replaced.
The KPIs defined below, the call-out log with times, open defects by age, parts used, and energy per occupied room where meters allow.
Monthly
CT-23
Fire and life safety (FLS) and water safety records
Pump runs, alarm tests and inspections, kept for Civil Defense, with the water management plan and its Legionella monitoring log.
Ongoing
CT-24
Lifecycle plan and CapEx forecast
Every major asset with its install year, expected service life adjusted for Riyadh duty, condition score, repair spend to date and a recommended replace-by year, rolled up into a five-year CapEx table for your budget cycle.
Yearly
What the monthly report measures
Each KPI is defined the same way every month, so bidders can be compared and performance tracked. The targets are agreed per site and written into the agreement.
KPI
Definition
Target
PPM completion
Planned tasks done in their scheduled window, divided by tasks scheduled
Agreed per site
Statutory compliance
Fire, water-safety and electrical tasks done on time. Reported separately, never averaged into PPM completion
Agreed per site
Response and fix by priority
Call-outs attended, made safe and fixed within the times in the service-level table, per priority
Agreed per site
First-time fix rate
Call-outs closed on the first visit, divided by all call-outs
Agreed per site
Work-order ageing
Open work orders grouped by age: 0–7, 8–30 and over 30 days
Agreed per site
Repeat faults
The same asset failing twice within 30 days
Agreed per site
Asset downtime
Hours out of service for chillers, generators and pumps
Agreed per site
Rooms out of order
Room-nights lost to engineering faults
Agreed per site
Energy per occupied room
kWh per occupied room, compared against a baseline adjusted for cooling degree-days and occupied room-nights (ASHRAE Guideline 14); chiller-only and whole-plant kW/TR from the BMS trend, reported separately by outdoor-temperature band, where meters allow
They are agreed in the contract, priority by priority, once we know the hotel's location, its in-house cover and what it needs. We'd rather write down a time we can keep than advertise one.
Do you replace our in-house engineering team?
Usually not. We work alongside them, take the planned and specialist work off their hands, and leave them free for guest requests. The split is written into the agreement.
Can you maintain systems you didn't install?
Yes. The start-up survey records the condition of everything before the agreement begins, so existing defects are listed and priced separately rather than discovered later.
What about equipment still under the maker's warranty?
We keep to the warranty conditions, coordinate the maker's own visits where the warranty requires them, and log them in the same plan so nothing is done twice. Manufacturers' warranties are separate from any contractor's defects period, and the register lists them separately.
Do we have to use your system?
No. We work in your CAFM if you have one, with our technicians logging work orders against your asset IDs. If you don't, we keep the work-order log and give you the full history in a standard export (Excel or CSV). The asset register and the maintenance history belong to the hotel, and you get them in full if the agreement ends.
How does maintenance feed the lifecycle plan?
Every job sheet updates the asset's condition and repair spend. Once a year that history becomes the lifecycle plan and five-year CapEx forecast (CT-24), so the owner sees which plant is due for replacement before it fails, and where repair has stopped making sense.
Codes we work to
The Saudi regulations and standards behind this service, with what each covers and how we apply it.