Planned maintenance, scheduled a year ahead

A monthly agreement that covers your plant, your fire systems and the call-outs in between. Every planned visit is on the calendar before the year starts, and every job closes with a sheet your engineer signs.

Example year plan · illustrative frequencies

A maintenance year for a mid-size hotel

Typical service frequency by asset group and month
Asset group JanFebMarAprMayJunJulAugSepOctNovDec
ChillersRoof plant
AHUs and fan coilsPlant and guest rooms
PumpsChilled water, booster, transfer
LV switchboard and generatorBasement
Fire alarm and sprinklersDiesel fire pump run weekly by the hotel's shift technician; logs checked by us monthly
Water tanks and hot waterTanks, boosters, calorifiers
  • Monthly
  • Quarterly
  • Semi-annual
  • Annual

Reactive maintenance · how a call-out is logged and closed

  1. Logged

    Your team reports the fault by phone or message to our duty contact and gets a reference number straight away.

  2. Prioritised

    The priority is set with your duty engineer, using the categories written into the contract.

  3. Attended

    A technician or specialist attends within the response time agreed for that priority.

  4. Fixed or made safe

    Fixed on the spot, or made safe with a dated plan for the permanent repair and any parts.

  5. Closed and signed

    Closed only when your duty engineer signs the job sheet. It appears in the monthly report with the time it took.

The shape of the service levels: what each priority is measured on
Priority (example categories)AcknowledgeOn siteMade safePermanent fixCover
EmergencyA life-safety system out, or loss of cooling, power or water to guest floorsAgreed per siteAgreed per siteAgreed per siteAgreed per siteAgreed per site
UrgentA guest room out of order, or plant running without its standbyAgreed per siteAgreed per siteAgreed per siteAgreed per siteAgreed per site
RoutineAnything that can safely wait for the next planned visitAgreed per siteAgreed per siteAgreed per siteAgreed per siteAgreed per site
Planned requestSmall works or changes the hotel asks for, booked into the planAgreed per siteAgreed per siteNot applicableAgreed per siteAgreed per site
Acknowledge
Call logged and a reference number given
On site
A technician or specialist at the fault
Made safe
No risk to guests, staff or plant, even if not yet repaired
Permanent fix
Repaired and closed on a signed job sheet
Cover
The hours the priority applies: a visiting team with call-out, or a resident technician on larger hotels

Response and fix times for each priority are agreed in the contract. We don't publish standard numbers, because they depend on where the hotel is, the size of your in-house team and the cover you need.

CT-20Planned maintenance programme · example12 monthsExample only

What a maintenance agreement covers

The exact list is built from your asset register. These are the lines it usually contains.

Preventive

Planned preventive maintenance

Monthly, quarterly, semi-annual and annual visits on a fixed calendar, following the makers' manuals.

Corrective

Call-outs and repairs

Faults logged, prioritised, attended and closed with a signed job sheet, with response times set in the contract.

HVAC

HVAC servicing

Chillers, AHUs, fan coils and pumps: filters, coils, belts, condensate drains and controls. Condenser coils washed before summer, refrigerant leak checks and head-pressure logs, and chilled water treatment dosed and sampled.

Fire safety

Fire and life safety maintenance

Fire pump runs and logs, sprinklers, alarm and detection, voice evacuation, emergency lighting, with records kept the way Civil Defense asks for them. Fire system maintenance is carried out only by Civil Defense-licensed contractors, under our site management, so it counts toward your Salamah safety licence (رخصة السلامة).

Power

Electrical and standby power

Monthly generator runs on real load rather than idle starts, an annual load bank test, LV switchboard inspections and thermal imaging, distribution boards and lighting.

Coordinated

Specialist systems, in the same plan

Lifts and escalators stay under the maker's or a licensed lift contractor, with their inspection certificates tracked. Guest technology and extra-low-voltage (ELV) systems (key cards, Wi-Fi, IPTV, CCTV), LPG and pool plant stay with their specialists. We bring their visits into one calendar and one monthly report, and keep the power and interfaces we look after working.

Water

Water, hot water and drainage

Legionella controls to the hotel's water management plan: hot water stored at 60 °C and every outlet reaching 50 °C within one minute, as the plan sets, monthly sentinel-tap temperature checks and sampling. Tank cleaning and disinfection, booster setpoint and pressure-reducing valves, sump pumps and drain jetting.

Typical situations

When reactive calls crowd out planned maintenance

  • The in-house team is a few technicians and a night shift, and guest complaints eat every planned visit.

  • A conversion or upgrade has just been handed over, and the new plant has to be maintained to keep its warranty.

  • An operator or brand audit asks for PPM records the hotel can't produce.

  • Civil Defense asks for fire system maintenance records at renewal.

  • A maker's service contract is ending, and the hotel wants one agreement for all its plant.

  • A management company is preparing to open a hotel and needs maintenance in place from the first day.

How the engagement works

It starts with counting what you have

No one can maintain a building properly without an asset register. If you don't have one, building it is the first month's work.

  1. Start-up survey

    Every asset tagged with a barcode or QR label in a location hierarchy (building, floor, room or plant room, system, asset), with make, model, serial, install date and condition score, and any existing defects listed before the agreement starts.

  2. PPM schedule

    Your year plan, like the one above, built around occupancy and events.

  3. Mobilise

    Named contacts, call-out routes and permits agreed with your chief engineer.

  4. Visits and call-outs

    Planned visits on the calendar, call-outs logged and closed with signed sheets.

  5. Monthly review

    A report and a meeting: what was done, what was found, what needs a decision.

Who signs off
Asset register and defects listHotel chief engineer
Year planChief engineer and general manager
Each planned visit and call-outDuty engineer, on the job sheet
Monthly reportChief engineer, copied to the owner if you ask
ServiceMonthly agreement

Hotel maintenance agreement

A monthly fee for the scope in your asset register. What the fee includes (labour, consumables, parts, call-outs) and the response and fix times are written into the agreement before it starts.

  • Fire system visits by Civil Defense-licensed contractors, managed by us
  • Manufacturer warranty visits coordinated in the same plan

What you receive

Records an auditor can follow

Brand audits, insurers and Civil Defense all ask the same question: show me it was done. These documents answer it, with the same codes as our full document register.

RefDocumentWhat's in itWhen
CT-19Asset registerEvery asset with its tag, location, make, age and condition, kept in your CAFM if you have one, or in a standard export your system can import. The register and the maintenance history belong to the hotel.Month one
CT-20PPM year planThe calendar of visits for your building, by asset group.Month one, reviewed yearly
CT-21Signed job sheetsOne per visit or call-out: what was checked, found and replaced.Every job
CT-22Monthly maintenance reportView a sampleThe KPIs defined below, the call-out log with times, open defects by age, parts used, and energy per occupied room where meters allow.Monthly
CT-23Fire and life safety (FLS) and water safety recordsPump runs, alarm tests and inspections, kept for Civil Defense, with the water management plan and its Legionella monitoring log.Ongoing
CT-24Lifecycle plan and CapEx forecastEvery major asset with its install year, expected service life adjusted for Riyadh duty, condition score, repair spend to date and a recommended replace-by year, rolled up into a five-year CapEx table for your budget cycle.Yearly

What the monthly report measures

Each KPI is defined the same way every month, so bidders can be compared and performance tracked. The targets are agreed per site and written into the agreement.

KPIDefinitionTarget
PPM completionPlanned tasks done in their scheduled window, divided by tasks scheduledAgreed per site
Statutory complianceFire, water-safety and electrical tasks done on time. Reported separately, never averaged into PPM completionAgreed per site
Response and fix by priorityCall-outs attended, made safe and fixed within the times in the service-level table, per priorityAgreed per site
First-time fix rateCall-outs closed on the first visit, divided by all call-outsAgreed per site
Work-order ageingOpen work orders grouped by age: 0–7, 8–30 and over 30 daysAgreed per site
Repeat faultsThe same asset failing twice within 30 daysAgreed per site
Asset downtimeHours out of service for chillers, generators and pumpsAgreed per site
Rooms out of orderRoom-nights lost to engineering faultsAgreed per site
Energy per occupied roomkWh per occupied room, compared against a baseline adjusted for cooling degree-days and occupied room-nights (ASHRAE Guideline 14); chiller-only and whole-plant kW/TR from the BMS trend, reported separately by outdoor-temperature band, where meters allowAgreed per site

The full document register

Before you sign a maintenance agreement

What are your response times?

They are agreed in the contract, priority by priority, once we know the hotel's location, its in-house cover and what it needs. We'd rather write down a time we can keep than advertise one.

Do you replace our in-house engineering team?

Usually not. We work alongside them, take the planned and specialist work off their hands, and leave them free for guest requests. The split is written into the agreement.

Can you maintain systems you didn't install?

Yes. The start-up survey records the condition of everything before the agreement begins, so existing defects are listed and priced separately rather than discovered later.

What about equipment still under the maker's warranty?

We keep to the warranty conditions, coordinate the maker's own visits where the warranty requires them, and log them in the same plan so nothing is done twice. Manufacturers' warranties are separate from any contractor's defects period, and the register lists them separately.

Do we have to use your system?

No. We work in your CAFM if you have one, with our technicians logging work orders against your asset IDs. If you don't, we keep the work-order log and give you the full history in a standard export (Excel or CSV). The asset register and the maintenance history belong to the hotel, and you get them in full if the agreement ends.

How does maintenance feed the lifecycle plan?

Every job sheet updates the asset's condition and repair spend. Once a year that history becomes the lifecycle plan and five-year CapEx forecast (CT-24), so the owner sees which plant is due for replacement before it fails, and where repair has stopped making sense.

Codes we work to

The Saudi regulations and standards behind this service, with what each covers and how we apply it.

All regulations and standards

Start with the asset register

Let's see what your building needs each month